top of page

Former Coal Tar Refinery

Construction Services

Follansbee, WV

WVDEP

Hank Pappert

$750,000

​

Former Coal Tar Refinery

Groundwater Treatment and Product Recovery 


This project consisted of constructing a mobile groundwater treatment system in a 53ft cargo trailer. Existing groundwater recovery wells were connected via subsurface HDPE conveyance piping. Sections of transition piping located above ground were heat-traced and insulated. 480V 3P recovery well control panels were retrofitted to provide process control from an HMI located in the mobile treatment trailer, as well as remote access via cellular communication.

© 2026 FTS Construction, LLC (FTSCO)

bottom of page