FTSCO has performed a wide variety of projects. Please click "more" to open a PDF file with additional information on each project.

Former Coal Tar Refinery

Former Coal Tar Refinery

Construction Services

WVDEP

Hank Pappert

$750,000

Groundwater Treatment and Product Recovery 


This project consisted of constructing a mobile groundwater treatment system in a 53ft cargo trailer. Existing groundwater recovery wells were connected via subsurface HDPE conveyance piping. Sections of transition piping located above ground were heat-traced and insulated. 480V 3P recovery well control panels were retrofitted to provide process control from an HMI located in the mobile treatment trailer, as well as remote access via cellular communication.

Former Industrial Area

Former Industrial Area

Turnkey Design, Construction, OM&M

Regulatory Agency: NJDEP

Project Manager: Hank Pappert

Budget: >$2,000,000

Mobile Groundwater Treatment System


Chromium reduction treatment system equipped with a sludge press. Built with a designed max flow of 50 gpm. System components were housed within three individual climate-controlled trailers. The treatment trailers were assembled at the FTSCO Portersville, PA, Fabrication shop. Trailers were mobilized and installed on-site in Kearny, NJ. Treatment system components were connected utilizing 2-inch – 6-inch HDPE lines for conveyance of raw water, process water, and sludge to various stages of the treatment process.

Former Wood Treating Site

Former Wood Treating Site

Construction, O&M

Regulatory Agency: USEPA, Region III

Jim Zubrow, PG

Budget: >$300,000

Landfarming Soil Remediation


Landfarming was performed to enhance biodegradation of creosote constituents in surface soils to achieve an ecological-based cleanup.

Former Chemical Site

Former Chemical Site

Construction Services

Regulatory Agency: USEPA

Project Manager: Hank Pappert

Budget: $350,000

Groundwater/DNAPL Recovery System Upgrade


FTSCO extended casings of multiple hydraulic control wells and DNAPL recovery wells. Extension of existing 18-inch HDPE well risers, subgrade precast concrete well vault surface completions, subgrade recovery well electrical supply, and local control panels to accommodate processed dredge material (PDM) placement for the projected site redevelopment purposes.

Former Coal Tar Refinery

Former Coal Tar Refinery

Construction Services

Regulatory Agency: WVDEP

Project Manager: Hank Pappert

Budget: $750,000

Groundwater Treatment and Product Recovery 


This project consisted of constructing a mobile groundwater treatment system in a 53ft cargo trailer. Existing groundwater recovery wells were connected via subsurface HDPE conveyance piping. Sections of transition piping located above ground were heat-traced and insulated. 480V 3P recovery well control panels were retrofitted to provide process control from an HMI located in the mobile treatment trailer, as well as remote access via cellular communication.

Former Industrial Site

Former Industrial Site

Construction, O&M

Regulatory Agency: USEPA

Dale Foster, PE

Budget: >$500,000

Temporary Groundwater Treatment System


Temporary chromium reduction system constructed to manage groundwater during the permanent system rebuild.

Former Coke Oven Facility

Former Coke Oven Facility

Construction Services

Regulatory Agency: USEPA, MD Department of the Environment

Project Manager: Hank Pappert

Budget: $250,000

Groundwater Treatment and Product Recovery 


The project consisted of installation and startup services associated with interim remedial measures (IRM) in two areas of the facility. The IRM for one of the two areas included groundwater recovery wells, soil vapor extraction, air sparging, vapor treatment, groundwater treatment, and groundwater reinjection. The IRM for the second area included high vacuum dual phase extraction, vapor treatment, groundwater treatment, and groundwater reinjection.

Former Waste Storage Area

Former Waste Storage Area

Construction Services

Regulatory Agency: USEPA Region IV

Project Manager: Hank Pappert

Budget: $1,000,000

In-Situ Soil Treatment 


In-situ chemical oxidation and soil stabilization on approximately 500cy of in place material to reduce mass VOC concentrations in source area soils and prevent leaching of site constituents into groundwater. Achieved total VOC reduction of three orders of magnitude in source area soils (pre-treatment total VOCs averaging ~650 ppm, post-treatment total VOCs averaging ~0.5 ppm), achieved unconfined compaction performance criteria, and SPLP performance criteria.

Acid Mine Drainage Treatment System

Acid Mine Drainage Treatment System

Construction

Regulatory Agency: PADEP

Project Manager: Hank Pappert

Budget: $1,000,000

Sludge Cleanout of Settling Pond


Hydraulically removed sludge from a 1.5-acre settling pond used to neutralize incoming mine drainage. Sludge

removal necessary to restore treatment efficiency of the settling pond. Removed sludge and managed material onsite.