Former Coal Tar Refinery
Construction Services
WVDEP
Hank Pappert
$750,000
Groundwater Treatment and Product Recovery
This project consisted of constructing a mobile groundwater treatment system in a 53ft cargo trailer. Existing groundwater recovery wells were connected via subsurface HDPE conveyance piping. Sections of transition piping located above ground were heat-traced and insulated. 480V 3P recovery well control panels were retrofitted to provide process control from an HMI located in the mobile treatment trailer, as well as remote access via cellular communication.

Former Industrial Area
Turnkey Design, Construction, OM&M
Regulatory Agency: NJDEP
Project Manager: Hank Pappert
Budget: >$2,000,000
Mobile Groundwater Treatment System
Chromium reduction treatment system equipped with a sludge press. Built with a designed max flow of 50 gpm. System components were housed within three individual climate-controlled trailers. The treatment trailers were assembled at the FTSCO Portersville, PA, Fabrication shop. Trailers were mobilized and installed on-site in Kearny, NJ. Treatment system components were connected utilizing 2-inch – 6-inch HDPE lines for conveyance of raw water, process water, and sludge to various stages of the treatment process.

Former Chemical Site
Construction Services
Regulatory Agency: USEPA
Project Manager: Hank Pappert
Budget: $350,000
Groundwater/DNAPL Recovery System Upgrade
FTSCO extended casings of multiple hydraulic control wells and DNAPL recovery wells. Extension of existing 18-inch HDPE well risers, subgrade precast concrete well vault surface completions, subgrade recovery well electrical supply, and local control panels to accommodate processed dredge material (PDM) placement for the projected site redevelopment purposes.

Former Coal Tar Refinery
Construction Services
Regulatory Agency: WVDEP
Project Manager: Hank Pappert
Budget: $750,000
Groundwater Treatment and Product Recovery
This project consisted of constructing a mobile groundwater treatment system in a 53ft cargo trailer. Existing groundwater recovery wells were connected via subsurface HDPE conveyance piping. Sections of transition piping located above ground were heat-traced and insulated. 480V 3P recovery well control panels were retrofitted to provide process control from an HMI located in the mobile treatment trailer, as well as remote access via cellular communication.

Former Coke Oven Facility
Construction Services
Regulatory Agency: USEPA, MD Department of the Environment
Project Manager: Hank Pappert
Budget: $250,000
Groundwater Treatment and Product Recovery
The project consisted of installation and startup services associated with interim remedial measures (IRM) in two areas of the facility. The IRM for one of the two areas included groundwater recovery wells, soil vapor extraction, air sparging, vapor treatment, groundwater treatment, and groundwater reinjection. The IRM for the second area included high vacuum dual phase extraction, vapor treatment, groundwater treatment, and groundwater reinjection.

Former Waste Storage Area
Construction Services
Regulatory Agency: USEPA Region IV
Project Manager: Hank Pappert
Budget: $1,000,000
In-Situ Soil Treatment
In-situ chemical oxidation and soil stabilization on approximately 500cy of in place material to reduce mass VOC concentrations in source area soils and prevent leaching of site constituents into groundwater. Achieved total VOC reduction of three orders of magnitude in source area soils (pre-treatment total VOCs averaging ~650 ppm, post-treatment total VOCs averaging ~0.5 ppm), achieved unconfined compaction performance criteria, and SPLP performance criteria.

Acid Mine Drainage Treatment System
Construction
Regulatory Agency: PADEP
Project Manager: Hank Pappert
Budget: $1,000,000
Sludge Cleanout of Settling Pond
Hydraulically removed sludge from a 1.5-acre settling pond used to neutralize incoming mine drainage. Sludge
removal necessary to restore treatment efficiency of the settling pond. Removed sludge and managed material onsite.